925 Sterling Silver Wholesale Payment Terms Guide
Factory notes/

01Why the Money Terms Matter as Much as the Metal

Most first-time buyers spend weeks comparing silver prices per gram and almost no time on the payment clause. Then the goods land at port and the argument starts over who pays the destination charges. I have watched this happen from the QC bench for twelve years, and it is always cheaper to settle the terms before the PO is signed.

This piece walks through the money side of a 925 sterling silver wholesale order: what you put down, when the balance is due, how freight is quoted, and where our factory sits compared with a typical trading company. No theory, just how we run orders.

02Deposit Structure: What 30 Percent Actually Buys

On a standard production order we ask for 30 percent by T/T as a deposit, with the remaining 70 percent due against the pre-shipment inspection report and photos. That deposit is not a goodwill gesture. It releases the casting or stamping slot, locks the silver rate for the batch, and pays for the stones we have to pull from stock.

For a first order, the deposit also covers the CAD work if you need a new design. We do not charge separately for a simple revision cycle, but the mold or master model stays with us until the order is paid in full. That is normal in this trade and worth knowing up front.

  • T/T 30 percent deposit, 70 percent before dispatch
  • PayPal accepted for sample orders and for buyers who need a card-based trail
  • Balance can be split if you are running two shipments from one PO
  • We do not start production on a verbal commitment, only on cleared funds
On a standard production order we ask for 30 percent by T/T as a deposit, with the remaining 70 percent due against the pre-shipment inspection report and photos. That deposit is not a goodwill gesture. It releases the casting or stamping slot, locks the silver rate for the batch, and pays for the stones we have to pull from stock.

03Samples, Stock and Custom: Three Different Payment Paths

Stock items carry a minimum of one piece, and those ship on full payment because there is no production risk on our side. Custom designs start at 30 pieces per style, and that is where the deposit structure applies. The gap between the two is not a sales tactic; it is the difference between picking from a shelf and cutting a new master.

Sample orders are small and fast, so PayPal is usually the easiest route for a buyer testing us for the first time. Once you move to a repeat order, T/T is cheaper on fees and we can hold the deposit against a written proforma. If you are unsure which path fits, send the design and quantity and we will tell you plainly.

04Freight Terms: DDP Explained Without the Jargon

We quote DDP as standard for US and EU buyers, which means the price you see includes delivery to your door and the import duty is handled on our side. Transit runs 5 to 8 days by air express for most destinations. That is faster than sea freight and, for orders under a few hundred kilos, usually cheaper once you add up port fees and brokerage.

If you prefer your own forwarder or an FOB arrangement, we will work with that too. Just be clear about who clears customs, because a shipment held at destination because nobody paid the duty is the single most expensive mistake a new importer makes.

TermWho pays freightWho clears dutyTypical transitBest for
DDPFactoryFactory5-8 daysFirst orders, small parcels
FOBBuyerBuyerDepends on forwarderBuyers with a customs broker
EXWBuyerBuyerDepends on forwarderBuyers with a China agent

05Where the 12 to 18 Day Production Window Comes From

Custom orders run 12 to 18 days from deposit clearance to dispatch readiness. That window is not padding. It covers wax printing or stamping, casting, setting, polishing, plating if required, and the three QC stages. Stock orders move faster because they skip the tooling steps.

The reason we can hold that window while trading companies often quote 25 days or more is simple: the casting, setting and polishing benches are in our building, not subcontracted across three suppliers. There is no handoff queue, so a delay on one bench does not silently add a week. Our cost, speed and yield typically run about 20 percent better than a trading company for that same reason.

06The Three QC Gates Your Deposit Is Paying For

Stage one is incoming stone check. Every parcel of moissanite or lab-grown stones is inspected for color, cut and inclusions before it touches a setting bench. Stage two is in-process inspection at the setting and polishing stations, where we catch a loose prong or a bad solder joint while the piece is still fixable.

Stage three is pre-ship AQL sampling against your approved spec, with photos sent to you before the balance is requested. Certificates come with the goods: GRA for the stones and IGI where the order calls for a graded report. If a batch fails AQL, it does not ship and the balance is not due. That is the point of paying the balance against inspection rather than against a production promise.

A buyer who pays the balance before seeing the inspection photos has given up the only leverage they had. Ask for the report first.

07What Changes on a Repeat Order

Once we have your spec on file, reorders skip the CAD and sample stage, which pulls the production window toward the short end of the 12 to 18 day range. We can also hold a rolling stock of your best sellers if you commit to a quarterly volume, though that is a conversation for the second or third order, not the first.

The payment terms stay the same on reorders unless you have built a track record with us. We are open to adjusting the deposit split after several clean cycles, but we do not offer open credit to a buyer we have shipped to once.

08Frequently Asked Questions

What is the minimum order for 925 sterling silver wholesale?

Stock items start at one piece, so you can test quality before committing. Custom designs start at 30 pieces per style, and the price per piece drops as the quantity rises. Send the design and we will quote both tiers.

How long does production take after I pay the deposit?

Custom orders run 12 to 18 days from cleared deposit to dispatch readiness, including the three QC stages. Stock orders ship faster because there is no tooling involved. DDP transit then adds 5 to 8 days.

How is the price calculated, and can I pay by PayPal?

Pricing is per piece and reflects the silver weight, stone grade, plating and setting labor, quoted against your quantity. PayPal works for samples and small orders; production orders run on T/T with a 30 percent deposit. Ask for a written quote with the breakdown.

If you are ready to move, send your design files, target quantity and destination country to service@holycome.com or message us on WhatsApp at +86 133 7744 7107. We will come back with a per-piece price, the deposit figure and a delivery date, and we can ship a sample first so you see the metal before you commit to a batch.

Need a quote on this?Send stone, size and quantity — we reply with costed options inside one working day.
Request pricing →

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .