01Why your six-month plan fails before the first PO
Most buyers I talk to build a six-month plan the same way: pick the top-selling shapes and colors, then multiply by a monthly forecast. That works in theory. On the floor it breaks around month two, because depth and sell-through pull in opposite directions and nobody wrote down which one wins.
I have run incoming stone checks for over a decade, and the pattern is boringly consistent. Buyers who lock too much depth on slow movers end up carrying dead stock into month five. Buyers who chase sell-through with no depth buffer spend the last quarter air-freighting replacements at three times the freight cost. The plan that survives sits in the middle, and it is built shape by shape, not SKU by SKU.
02Depth is not a number, it is a decision per shape
When a buyer asks me how deep to go on synthetic stones wholesale, the honest answer is that round brilliant is a different animal from a marquise or an emerald cut. Round brilliant in 1ct to 2ct equivalents moves fast and predictably. Fancy shapes move in bursts, often tied to one or two accounts.
So the six-month depth should be tiered. Give your proven core shapes a depth buffer that covers roughly eight to ten weeks of expected movement. Give seasonal or fashion shapes a buffer closer to four weeks, and plan to refill rather than stockpile.
- Core rounds and standard ovals: eight to ten weeks of cover, reorder at 40 percent remaining.
- Fancy cuts and colored moissanite: four weeks of cover, reorder at 50 percent remaining.
- 925 silver set pieces: six weeks of cover, reorder at 45 percent remaining.
- New or unproven SKUs: sample quantity only, no depth until first reorder.
When a buyer asks me how deep to go on synthetic stones wholesale, the honest answer is that round brilliant is a different animal from a marquise or an emerald cut. Round brilliant in 1ct to 2ct equivalents moves fast and predictably. Fancy shapes move in bursts, often tied to one or two accounts.
03The math that actually holds up over six months
Here is the version I give buyers who want a plan they can defend to a finance person. Take your expected six-month unit sales per shape, divide by six for a monthly rate, then multiply by your cover weeks and divide by 4.3. That is your opening depth for that shape. Everything else is buffer.
The mistake is applying that same multiplier across the whole catalog. A single blended number hides the fact that your emerald cut is starving while your pear shape is drowning. Run the math per shape and per size band, then total it.
| Shape group | Cover target | Reorder trigger | Typical MOQ | Lead time |
|---|---|---|---|---|
| Round brilliant, 0.5-2ct | 8-10 weeks | 40% left | 1 pc from stock | 3-5 days DDP |
| Oval and cushion | 8 weeks | 40% left | 1 pc from stock | 3-5 days DDP |
| Fancy cuts, colored | 4 weeks | 50% left | 30 pcs custom | 12-18 days |
| 925 silver finished | 6 weeks | 45% left | 30 pcs custom | 12-18 days |
Two things to note in that table. Stock items ship from what we already hold, so MOQ is one piece and you can test a shape without committing. Custom runs start at 30 pieces per design and take 12 to 18 days in production, which is where your six-month calendar needs slack.
Depth without a reorder trigger is just inventory. A trigger without lead-time slack is just a stockout with extra steps.
04Where sell-through gets misread
Sell-through is usually calculated as units sold divided by units available. That number looks healthy for a shape you restock constantly, because available stays low. It looks terrible for a shape you over-bought in month one, because available stays high all six months. Same demand, opposite scores.
I prefer to look at weeks of cover alongside sell-through. If a shape has four weeks of cover and a 70 percent sell-through, it is fine. If it has sixteen weeks of cover and the same 70 percent, you bought wrong. Track both, and let cover drive the reorder, not the percentage alone.
05Certificates, QC, and why they affect your plan
Every stone that leaves our floor goes through three checkpoints: incoming stone check on arrival from the cutting room, in-process inspection during setting or matching, and a pre-ship AQL sampling pass before packing. That third stage is where most surprises get caught, and it is also why our reorder reliability holds up over a long plan.
Certificates matter for planning too. GRA certificates come with the loose stones as standard. IGI is available on request for larger or higher-value pieces, and it adds a few days to the schedule. If your six-month plan includes a retail-facing launch, build that certificate lead time into the calendar now, not in month five.
06Payment, freight, and the 20 percent edge
Standard terms are T/T with 30 percent deposit and balance before shipment. PayPal works for samples if you need to move fast before the deposit clears. DDP delivery runs 5 to 8 days to most US and EU addresses, which is the number to use when you set reorder triggers.
Our cost, speed, and yield run about 20 percent better than typical trading companies. The reason is simple: we cut, set, and QC in the same building, so there is no middle layer marking up stones it never touches, and no week lost to a handoff between a trader and a subcontractor. That is the whole trick.
07Building the calendar around the plan
Work backward from your six-month endpoint. Put the last reorder date at least three weeks before you need the goods, which covers the 12 to 18 day custom window plus DDP transit and a QC buffer. Anything ordered after that date should be stock items only.
Then mark two review points, one at month two and one at month four. At each, kill the SKUs with more than twelve weeks of cover and shift that budget to shapes sitting under five weeks. That single habit keeps depth and sell-through from drifting apart.
08Frequently Asked Questions
What is the minimum order for synthetic stones wholesale?
Stock items start at one piece, so you can sample a shape before committing to depth. Custom designs begin at 30 pieces per design, with production running 12 to 18 days.
How is pricing calculated and how long does delivery take?
Price is quoted per piece or per carat depending on the item, based on size, cut grade, color, and certificate choice. DDP delivery is typically 5 to 8 days after dispatch, with T/T 30 percent deposit as standard and PayPal accepted for samples.
Which certificates come with the stones?
GRA certificates ship with loose stones as standard, and IGI is available on request for higher-value pieces. Every order passes a three-stage QC including pre-ship AQL sampling before it leaves the factory.
If you want to test this approach, send your shape and size mix and I will come back with a suggested six-month depth split plus a sample quote. Reach the team at service@holycome.com or WhatsApp +86 133 7744 7107 and ask for the stock list alongside your quote.