Synthetic stones are made to order more often than buyers expect. A calibrated parcel of synthetic corundum, a custom setting and a plating run are all committed before the first stone is set, which means the deposit on a purchase order is not a courtesy payment — it funds work that has already started. The decisions that follow are about matching each payment to the event it actually pays for.
01Why synthetic stones are a deposit-heavy category
Three cost lines open before anything is polished, and each one behaves differently.
Man-made material is produced in runs, not picked from a shelf
Synthetic corundum — ruby and sapphire — is grown as a boule, then sawn and polished to a target millimetre size rather than a target weight. Both sit at Mohs 9 with a specific gravity near 4.0. A calibrated parcel is the output of a cutting run, so the deposit buys a place in that run instead of moving existing stock.
Cubic zirconia and synthetic spinel behave the same way at different figures, with CZ at Mohs 8.5 and a specific gravity between 5.6 and 6.0.
The metal line is bought at a daily benchmark
Karated gold and sterling silver are priced off a metal benchmark plus a premium, so the figure holds only to the day the metal is bought. In proportions: 10K is about 41.7 percent gold, 14K about 58.5 percent, 18K 75 percent, and sterling silver 92.5 percent. A deposit anchored to a unit price rather than a rate date leaves the metal exposure undefined, which is why the purchase order should name both the rate date and the settlement currency.
Tooling and bath charges predate the first stone
Casting trees need a minimum fill to justify a melt, setting benches need a drill and a prong position per millimetre size, and a plating bath carries its own batch charge. Twenty pieces at 0.3 micron and two thousand pieces at 0.3 micron are not the same version of one process. These charges begin on approval rather than on delivery, and a deposit built from a unit price will not cover them.
02What the deposit should actually cover
Committed spend, not the whole invoice
The cleanest structure splits the invoice along the point where the factory has spent money. The deposit covers grown material, calibrated cutting, moulds, drill changes and the plating batch; the balance covers setting labour, finishing and margin. Stated that way, a supplier who asks for more is asking to finance a longer stretch of the cycle, and one who asks for less is carrying that stretch itself.
Why the standard split moves with the order profile
A repeat of a stocked design can sit on thirty percent deposit and seventy percent before shipment. A first order with new tooling usually moves the first payment to forty or fifty percent, because the moulds have no resale value if the order is cancelled. A line the supplier already stocks can sometimes ship on open account, where the risk sits on the supplier's balance sheet rather than in a deposit.
Where a sample fee belongs
A sample is normally billed as its own line at its own cost, then credited against the first bulk order once that order clears a stated value. The credit condition has to be written down, because a sample fee credited against a fifty-piece order is a discount, while the same fee credited against a two-thousand-piece order is rounding.
The cleanest structure splits the invoice along the point where the factory has spent money. The deposit covers grown material, calibrated cutting, moulds, drill changes and the plating batch; the balance covers setting labour, finishing and margin. Stated that way, a supplier who asks for more is asking to finance a longer stretch of the cycle, and one who asks for less is carrying that stretch itself.
03Terms that decide who carries the risk before delivery
The release trigger for the balance
A balance released against a shipping date pays for a promise; a balance released against a verifiable document pays for goods. The usual triggers are a pre-shipment inspection report or a bill of lading copy, and the wording should name the document rather than the event.
Currency, rate date and bank charges
The settlement currency and its rate date belong on the same line as the price. A fixed fee from a correspondent bank is small on a container and noticeable on a carton, so the purchase order should say who pays it and on which side of the wire.
Naming the delivery point
A DDP price without a named address is an unfinished quote. Duty paid to a port and duty paid to your warehouse differ by the last mile, and the import duty, the clearance agent and the final delivery each sit on a separate line of the landed cost.
| Structure | First payment | Balance trigger | Where it fits |
|---|---|---|---|
| T/T staged | 30 percent at order | 70 percent before shipment | Stocked designs and repeat orders |
| Inspection-linked | 30 to 50 percent at order | Inspection report or bill of lading copy | First orders with new tooling |
| Letter of credit | Issued by the buyer's bank | Documents presented at sight | Larger lots and unfamiliar suppliers |
| Third-party escrow | Funded on order | Released on delivery confirmation | New lines with high unit value |
The deposit is the part of the invoice that pays for work already committed, and the terms around it decide who is exposed while the goods are in transit. Part 2 sets out the price list fields that follow from this structure and the payment negotiations that move one line at a time.
Synthetic stones run through a production sequence rather than off a shelf, so payment terms follow that sequence rather than the calendar. The deposit pays for work already committed; the balance pays for work finished and verified.
04Where each payment lands against a price list line
A price list for synthetic stone jewellery carries four lines, each paid at a different moment. Mapping the schedule onto those lines keeps a deposit from reading as a commission.
The deposit lines are the ones already incurred
The deposit covers the calibrated stone lot, the tooling for each millimetre size, and the plating batch load. Synthetic corundum is grown and then cut to a target size, so the parcel is ordered to your specification before the first stone is set. Cubic zirconia, near Mohs 8.5 with a specific gravity of 5.6 to 6.0, is sorted the same way by caliper. None of it is recoverable once the mould is cut.
The balance lines are the ones still being worked
Setting, finishing and packing sit on the balance side because they happen after the buyer can inspect. A halo of forty small stones is forty setting actions, not one.
Currency and rate date belong on the same line
Karat gold is bought at a daily benchmark, so the list should name the rate date and settlement currency beside the alloy. The proportions are fixed: 10K about 41.7 percent, 14K about 58.5 percent, 18K 75 percent, sterling silver 92.5 percent.
05Which lines respond when a buyer negotiates
Not every line reacts to volume the same way, and treating them as one number loses ground on the lines that could have moved.
Per-operation lines spread; calibrated lots do not
Setting and finishing are charged per operation, so a larger batch spreads labour and the per-piece figure falls. The calibrated stone line is largely fixed: a cutting batch is run to a size, and a second millimetre size starts a second batch. A seat cut for 6.50 mm will not close on a 6.65 mm stone, against a tolerance band of about 0.10 mm.
A wider colour band is often the cheaper move
Widening a colour band by one grade can often be filled from a single cutting lot and keeps one reference stone in play. A new millimetre size or alloy starts a separate calibration batch. A supplier who can explain which floors combine is describing a process, not reciting a number.
06Fields that keep a reorder from becoming a new product
Terms hold only if the goods are specified tightly enough to repeat. Six fields should carry from the first order to the second.
- Full material name as it will appear on the tag, with laboratory-grown or laboratory-created stated at every appearance and no use of real, genuine or natural.
- Measured size with its tolerance band, in millimetres rather than carats, since specific gravity shifts the link between weight and diameter.
- Colour scale and reference stone, named in the purchase order so two quotations compare line by line.
- Plating target in microns at the wear point, from about 0.05 micron for display pieces to 1.0 micron and above for daily skin contact.
- Surface finish by grit and brush direction, since two batches both called satin can reflect differently.
- Release document for the balance, normally a pre-shipment inspection report rather than a dispatch date.
| Price list line | Payment moment | What to record | Failure it prevents |
|---|---|---|---|
| Calibrated stone | Deposit | Size with tolerance band and grade scale | A second lot that will not seat |
| Metal | Deposit, at rate date | Karat proportion, currency and rate date | A price that moves after the order |
| Setting labour | Balance | Stone count and setting style | Labour billed per piece, not per action |
| Finishing | Balance | Microns at the wear point and grit | Wear showing through inside a season |
| Terms | Both | Currency, Incoterm and named delivery place | A landing cost found on arrival |
Order Terms for Wholesale Buyers
MOQ is 1 piece for stock styles and 30 pieces for custom work, and loose stones are sold by the carat. Sampling takes 7 to 10 days, and bulk production runs 15 to 25 days after the sample is approved. Pricing is quoted per piece or per carat depending on the item. Payment is T/T with a 30% deposit and the 70% balance before shipment, and PayPal is accepted for sample orders.
07Frequently Asked Questions
Should the deposit be a percentage of the invoice or a cost estimate?
Closer to a cost estimate. The useful question is which lines the supplier has already paid for. New tooling justifies more than a repeat line.
Can the balance be tied to anything other than dispatch?
To a verifiable document, which a pre-shipment inspection report provides. Tying it to a dispatch date only moves the dispute later.
Does a sample fee reduce the bulk price?
It is normally credited against the first bulk order, with a stated value threshold. Credited against fifty pieces it is a real discount; against two thousand it is a rounding figure.
What ends a dispute about colour?
A sealed reference stone per colour band and millimetre size, numbered and kept away from the working tray. Photographs read differently to each party.
When do delivery terms change the deposit?
When the Incoterm moves. A DDP quotation has to name the delivery address, because a price to the port and a price to the buyer’s warehouse are separated by the last mile.
08Closing notes for buyers
Terms that hold over a season tie to events the buyer can verify, not to dates that pass on their own. Our knowledge base on stone grading and payment structures covers the measurement conventions above, our about page explains how orders are scheduled from deposit to dispatch, and the privacy policy sets out how order documents and payment records are stored.
Sources: Grading references: GIA gem education and GIA laboratory information.