Rings Wholesale: shipping & DDP - HOLYCOME
Factory notes/
A parcel of rings is small, dense and valuable, and that combination settles the shipping question before any carrier is called. Two hundred mixed rings weigh a few kilograms and fill a box smaller than a shoe carton, so the air premium over sea is a rounding error against the value carried. What changes the landed result is not freight but duty, tax and the clearance charge, and those follow the trade term rather than the mode.

A parcel of rings is small, dense and valuable, and that combination settles the shipping question before any carrier is called. Two hundred mixed rings weigh a few kilograms and fill a box smaller than a shoe carton, so the air premium over sea is a rounding error against the value carried. What changes the landed result is not freight but duty, tax and the clearance charge, and those follow the trade term rather than the mode.

Chosen apart, a fast mode and a loose term produce a parcel that lands in three days and clears in ten.

01Why the mode and the Incoterm have to be chosen together

The mode sets how long the parcel sits in transit; the term sets who pays duty, tax and clearance and the point at which risk passes. On rings these are one decision, because the clearance queue usually outlasts the flight and because a door-to-door courier service is often delivered duty paid by default.

What each mode actually buys

Express air moves a ring parcel in two to five days, consolidated air in five to nine, and sea in three to five weeks. On a high-value parcel the air premium is small against the value, so the mode follows the retail calendar rather than the freight saving. Sea repays the wait only when the order sits weeks ahead of the season and the ring sizes are already committed.

Where risk passes

Under a term where the seller arranges carriage and insurance, risk can still pass at shipment rather than at the door. A parcel insured under Institute Cargo Clauses A covers most physical loss and damage; the narrower Clauses C covers only listed perils and leaves theft and non-delivery outside the policy. A ring parcel that is small and desirable is exactly the parcel narrow cover excludes.

Where the named place is written

A delivered-duty term needs a named place of destination that carries the city and the postal district rather than the country alone. Duty and tax can be assessed differently at different entry points, so a term that reads only the country leaves the final figure open after the order is placed.

02What a DDP quote has to itemise before it is signed

A delivered-duty quote is only useful if it separates the parts that move. A single figure hides which element changes when the parcel weight, the declared value or the entry point changes.

The four separate numbers

Freight, duty, tax and the clearance charge are four numbers, not one. Written separately, a buyer can see whether a rise came from the carrier, a duty rate or a broker fee, and can move one without reopening the other three.

The customs value basis

The declared value determines duty, and on a jewelry entry it is built from goods plus freight plus insurance rather than from the invoice total. A quote that names its basis lets the buyer check the arithmetic.

The description discipline

Invoice description, packing list and customs entry have to describe the same goods in the same words. A line that reads as a plain band on one document and as a gold band with set stones on another invites a hold at the border, and a held parcel misses the date the mode was chosen to meet.

A delivered-duty quote is only useful if it separates the parts that move. A single figure hides which element changes when the parcel weight, the declared value or the entry point changes.

03How to build delivery terms into the order rather than onto it

Delivery terms settled after the order are a price adjustment waiting to happen. Written into the order, they become lines the buyer can check against the documents that arrive with the rings.

Name the term, the place and the split

The order should carry the three-letter term, the named place with its city and postal district, and the split of duty, tax and clearance between the parties.

Fix the documents in advance

Invoice, packing list and entry description should be listed as documents the buyer will receive, in the wording that will appear on them. Ring orders usually carry a size curve and a stone line, so those fields belong in that list.

Set the claim window

The window for a short shipment, a wrong description or a damage claim should read as a number of days from the named place, not from a shipment date the buyer cannot see.

Order lineWhat it must stateWhat fails without it
ModeExpress, consolidated or sea, with the transit band in daysA late parcel against a fixed retail date
Trade termThe three letters and the named place with city and postal codeDuty and tax apportioned after arrival
Insurance clauseInstitute Cargo Clauses letter and the sum insuredA theft or non-delivery claim refused
Declared value basisGoods, freight and insurance added, with the currencyA duty figure that cannot be checked
Document wordingThe words that will appear on invoice, packing list and entryA held parcel and a missed date
Claim windowDays from the named place, with the party responsibleA claim filed too late to be accepted

Read across the table and each line is an instruction for a purchase order; read down the last column and each line is a failure that would otherwise appear as a cost or a delay after the rings have left the bench. Settled before the parcel is booked, these lines make a delivery the buyer can check rather than a date taken on trust.

Clearance is where a quoted delivery turns into a measured one. Before the parcel lands the buyer holds a booking and a quote; afterwards the same shipment is read against what the bench shipped and what the entry recorded.

04What the delivery record has to carry once the rings have cleared

The delivery record is the buyer's own file, opened before the parcel moves and closed on the day the last cost is known. Six lines carry it, and each can be written before the parcel is booked.

Record lineWhat it must stateWhat fails without it
Entry point and dateCity, postal district and date of entryA duty figure with no shipment to match
Customs valueGoods plus freight plus insurance, with currency and rate dateA value no document supports
Duty lineThe rate and the value it was applied toA total that hides which line moved
Tax lineThe rate and the duty-inclusive baseTax read as if charged on the goods alone
Advance feeAmount, date and the party that advanced itA charge with no date and no payer
Claim windowThe last day a loss can be filed, and who answersA claim filed too late to be accepted

Entry point and date

Duty and tax can differ by the point at which the rings enter, so the record carries the city, the postal district and the date rather than a country. A place written as a country cannot settle which scale applied when a figure is questioned months later.

The four cost lines, kept apart

Freight, duty, tax and clearance are four numbers. A DDP figure that arrives as one total cannot be checked, because a change in any one of them disappears into the sum. Each line is recorded with the value it was applied to.

Billable weight and its basis

A ring parcel is priced on the greater of actual weight and volumetric weight. Two hundred mixed rings may weigh a few kilograms and still be charged on volume.

05How to read a duty notice against the quoted four lines

The notice is the buyer's first sight of costs that were only estimated at booking. Read it against the quote, line by line.

Duty is assessed on the customs value

Customs value is goods value plus freight plus insurance, in the currency of the entry, and duty is charged on that figure rather than the invoice alone. When freight rises after booking, the duty base rises with it.

Tax is assessed on the value that includes duty

Tax is charged on the duty-inclusive value, so duty and tax cannot be read against the same base. A tax figure read as if charged on the goods alone will look heavier than it is.

The advance fee and its date

Where the seller or the broker advances duty and tax, the fee carries a date and a payer. Recorded without either, it reaches the total as an amount that cannot be assigned.

06Where a delay is assigned to the line that caused it

A late parcel is easier to correct when the delay is attached to the stage that caused it rather than to the booking.

Stage dates rather than one arrival date

Booked, collected, departed, arrived, entered and delivered are six dates. Filled in as they happen, they show whether the parcel waited with the carrier, the broker or the recipient.

The lane that repeats

Two delays on the same lane in the same season are a lane event rather than a booking error, and the answer is a different route or broker. One delay is a booking; the same lane twice is a specification.

07Order Terms for Wholesale Buyers

MOQ is 1 piece for stock styles and 30 pieces for custom work, and loose stones are sold by the carat. Sampling takes 7 to 10 days, and bulk production runs 15 to 25 days after the sample is approved. Pricing is quoted per piece or per carat depending on the item. Payment is T/T with a 30% deposit and the 70% balance before shipment, and PayPal is accepted for sample orders.

08Frequently Asked Questions

Does a faster mode remove the duty cost?

No. The mode moves the parcel; duty and tax follow the terms and the entry. A faster flight under a loose term leaves the same duty base.

Can a DDP total be checked without the entry?

Only to a point. The four lines can be compared against the quote, but the rates and values behind them sit on the entry.

Who pays when the named place is wrong?

Whoever accepted the entry depends on the term. A place written without the city and postal district leaves that answer open.

How long should a claim window be?

Long enough to open every box and count the bands, short enough to be filed while the evidence is fresh. The window matters less than the party answerable, so both are named.

The two readings a buyer should never merge are the booking and the entry: one is a promise and the other is the record. Buyers who want the wider catalogue can compare the ring styles in our knowledge base, see how the workshop is run on our about page, and read how order data is handled in our privacy policy.

Sources: Grading references: GIA gem education and GIA laboratory information.

Need a quote on this?Send stone, size and quantity — we reply with costed options inside one working day.
Request pricing →

Written by the Holycome manufacturing & quality team. Every figure and claim in this article comes from our own production floor in Wuzhou, China — in-house casting, stone setting and a three-pass quality inspection we have run since 2008.

Materials are tested for nickel, lead and cadmium release by SGS and CTT International; moissanite centre stones ship with their GRA warranty card and report. We also hold an independent SMETA / Sedex ethical-trade audit and a Hong Kong Customs AML registration.

Reviewed for accuracy by our quality team before publication. Last updated .