When a supplier quotes a lead time for lab grown diamonds, the figure usually describes only one of two clocks. A sample order runs on a bench schedule: a handful of stones, one mounting, one polishing pass. A bulk order runs on a production schedule shaped by how the material arrives — rough grown first, then sawn, then polished to a calibrated size, then set.
Buyers who plan stock around a single quoted number discover late that the sample clock and the bulk clock start at different events and run at different speeds.
01Why a sample quoted in days becomes a bulk order quoted in weeks
The sample clock starts at drawing approval
The bench clock begins when the specification sheet is signed, not when the enquiry arrives. From that point the timeline runs through CAD revision, a wax or resin model, a single stone pulled to match the drawing, one casting, one setting pass and one polish. Because each step touches a single piece, small delays stay visible and can be absorbed by the same bench.
The bulk clock starts at sample sign-off and deposit
The production clock begins when the approved sample and the deposit both arrive. Everything before that point stays provisional: the calibrated goods are uncommitted, the mould is uncut, the casting tree unscheduled. A bulk lead time given before sample approval therefore describes a process rather than a date. Once the deposit lands, the schedule locks in the fields recorded on the sample sheet — measured size with its tolerance band, colour and clarity bands, alloy, plating target and finish.
What sits between the two clocks
The two clocks share a sequence but not a queue. A bench can finish one ring in a week; the same design in production waits behind whatever job already occupies the casting and setting stations. The practical question is not how long either order takes, but which event releases each one.
02The upstream step the two clocks often forget
Rough selection happens after the order, not before
Lab grown material does not sit finished in a bin. It is grown, then sawn into blocks, then polished down to the calibrated size the setting was cut for. Whether that polished size arrives this month or next depends on which rough is available to the cutter that week, not on the buyer's position in a queue. A production date quoted without reference to rough availability is an estimate of capacity rather than a delivery commitment.
A calibration lot is built, not picked
Bringing one hundred stones into a single colour and clarity band requires a sorting session, not a trip to existing stock. The lot is assembled stone by stone, and each grade step narrows the pool. This is why a second colour band or millimetre size can add a full cycle rather than a fraction, and why tolerance bands belong in the order.
Where queue position actually applies
Position in a queue matters at the stations the order must pass through: casting, setting and plating. It does not abbreviate the upstream growth and cutting steps. A supplier who can separate the two — the part that depends on material from the part that depends on capacity — can usually give a date; one who blends them into a single figure quotes an average.
Lab grown material does not sit finished in a bin. It is grown, then sawn into blocks, then polished down to the calibrated size the setting was cut for. Whether that polished size arrives this month or next depends on which rough is available to the cutter that week, not on the buyer's position in a queue. A production date quoted without reference to rough availability is an estimate of capacity rather than a delivery commitment.
03Three constraints that only appear at bulk scale
Calibrated goods are priced and sorted by millimetre
A seat cut for 6.50 mm will not close cleanly on a 6.65 mm stone, and the usual tolerance band runs about 0.10 mm. Loose goods are therefore bought by measured diameter rather than by carat weight, because carat weight shifts with proportion and cut yield. Diameter is the dimension the setting consumes, so it is the dimension the order should freeze.
Casting and plating have batch floors
A casting tree has to reach a minimum filled weight before it is worth firing, and a plating bath carries its own minimum load. Twenty pieces in a 0.3 micron plate are not a smaller version of two thousand; they are a different job, and a line below the bath's floor will be combined with unrelated work or re-priced.
Setting is grouped by size
Setters work in size batches because every change of stone diameter means a different drill and a different set of prong positions. Mixing three sizes in one order sends the work across the bench three times. Keeping a reorder to one or two calibrated sizes shortens the setting stage without touching anything else in the schedule.
| Field | What to record | Failure it prevents |
|---|---|---|
| Measured size | Diameter in millimetres with the tolerance band | Stones that will not seat in the cut setting |
| Colour and clarity | Bands stated against a sealed reference stone | Two lots that photograph alike and sort apart |
| Alloy | Karat with the maker's mark beside the quality mark | An orphan mark no party can trace |
| Plating | Microns measured at the wear point | Thin coverage at the point that touches skin |
| Batch size | Units per casting and per setting run | A line that stalls below the bath or tree floor |
The two clocks explain why the same supplier can give a confident sample date and a cautious production date on one enquiry. The rest of the planning sits in the fields above, where a reorder either matches the first lot or quietly becomes a second product.
Part one ended with two clocks and a table of fields worth recording. Part two turns those fields into questions: which event releases each stage, and what the specification must fix before the first bulk stone is set.
04Reading a quotation by the events that trigger it
Ask which event starts each clock
A lead time only means something next to the event that starts it. Thirty days attached to a deposit is a different promise from thirty days attached to sample approval, even when both figures appear on the same page. Two questions settle most of the ambiguity: what releases the sample run, and what releases the bulk run.
Ask what releases the balance
The third event closes the order. Some suppliers release the balance against a despatch date, others against an inspection report, others against a bill of lading. The choice decides who carries the risk while goods sit in a yard, so the trigger belongs in the purchase order.
The record a quotation should carry
A quotation that names its trigger events, its reference stone and its tolerance band can be compared line by line with another. One that offers only a figure and a price cannot, and the gap tends to surface at the second order.
05What the specification has to fix so the second lot matches the first
Measured size before carat weight
Lab grown diamonds are bought for the setting, and the setting consumes diameter. A seat cut for 6.50 mm will not close cleanly on a 6.65 mm stone, and the tolerance band runs about 0.10 mm.
Bands stated against a sealed reference
Colour and clarity behave as bands rather than single values once a line repeats. Keeping one sealed reference stone per colour band and millimetre size, numbered and stored away from the working tray, lets two lots be compared at the same bench under the same lamp.
Plating measured where it wears
Plating is consumed at the points that touch skin. A flash of about 0.05 micron suits a display piece, 0.3 micron suits occasional wear and 1.0 micron or more marks the entry point for daily contact. The figure should describe the wear point rather than a batch average.
06Why a reorder quote can move even when the design has not
Metal is priced off a daily basis
Once a design is frozen, the variables that still move are the metal basis and the supply of calibrated rough. Karat fixes the proportion — about 41.7 percent gold at 10K, about 58.5 percent at 14K and 75 percent at 18K — while the price of that metal on the day of casting does not wait for the order. A price list should name the currency and the date the rate was locked.
Cutting capacity tracks rough, not buyers
A reorder that adds a second millimetre size adds a second calibration lot, and a second lot waits on whichever rough reaches the cutter that week. The design has not changed; the upstream queue has.
07Order Terms for Wholesale Buyers
MOQ is 1 piece for stock styles and 30 pieces for custom work, and loose stones are sold by the carat. Sampling takes 7 to 10 days, and bulk production runs 15 to 25 days after the sample is approved. Pricing is quoted per piece or per carat depending on the item. Payment is T/T with a 30% deposit and the 70% balance before shipment, and PayPal is accepted for sample orders.
08Frequently Asked Questions
Why is bulk lead time longer than the sample?
The sample runs on a bench where one stone and one mounting represent the whole job. Bulk waits behind other work at casting, setting and plating, and it needs a calibration lot built before the first stone is set.
Can a production date be fixed before the sample is approved?
It can be estimated, but not fixed. The mould is uncut and the calibrated goods uncommitted until the sample is signed off and the deposit arrives, so a date given earlier describes capacity rather than commitment.
Does order size change the schedule?
Past the batch floors it changes very little. Below them it changes a great deal, because a casting tree needs a minimum filled weight and a plating bath needs a minimum load. A small order can therefore take as long as a large one.
How should delay be written into the terms?
By naming the triggering event, a review point and a remedy. A clause that ties the delivery date to sample approval and deposit, with a review at a stated number of days, gives both sides a fixed reference.
Can the sample fee be credited to the bulk order?
That is a commercial choice rather than a technical one, and it should be written down. Where a credit is offered, it usually applies above a stated order value and once, on the first bulk order.
| Trigger | What it releases | What it leaves open |
|---|---|---|
| Specification approval | The sample run | Bulk material and mould |
| Sample sign-off and deposit | The bulk schedule | Rough availability |
| Inspection report | The balance payment | Transit and duty |
| Delivery to the named place | Risk transfer | Nothing on the order |
A reorder that matches the first lot comes down to the fields on the specification and the events that release each stage, not the headline lead time. The technical notes on measuring calibrated stones live in our knowledge base; the finishing and inspection process is described on our about page; and the way order documents and test reports are kept is set out in the privacy policy.
Sources: Grading references: GIA gem education and GIA laboratory information.