01The 6-month window is the only planning unit that matters
Most buyers I talk to plan by season or by container. I plan by six months, because that is roughly how long a wholesale assortment stays relevant before either the market moves or your shelf space gets choked. Six months is also where the math gets honest: long enough that stock depth actually costs you money, short enough that you cannot just wait out a bad call.
I have been running incoming inspection and pre-ship checks on the floor for twelve years, and the single biggest mistake I see from US and EU buyers is buying depth where they needed velocity. They load up on one best-selling k gold wholesale SKU because the unit price drops, then discover the reorder cycle never got tested. Depth is a bet on sell-through. If you have not measured sell-through, depth is just a guess with freight attached.
So here is how I would structure a six-month k gold plan, in the order I actually think about it.
02Start with sell-through rate, not with stock levels
Before anyone talks about how many pieces to hold, get one number on the table: how many units of a given SKU leave your shelf per month, and how many months of cover you are holding right now. If you do not have that, pull your last two quarters and count. Everything else in this article depends on it.
In k gold wholesale, a healthy sell-through on a proven design is roughly 60 to 75 percent of received stock within the first 90 days. Below 40 percent and you are carrying a dud that will eat your cash for the rest of the year. Above 85 percent and you are probably understocked and losing walk-in or reorder sales to someone else.
Two things distort this number and you have to strip them out:
- Promotional spikes: one discounted weekend can make a slow SKU look fast, then it dies for five months.
- Stockout gaps: a SKU that was out of stock for three weeks will show an artificially low sell-through. Correct for the days it was unavailable.
- Returns and exchanges, which in k gold are usually fit and sizing, not quality. Count them separately.
Once you have a clean sell-through number per SKU, you can classify the assortment and stop treating every design the same. That classification is what drives depth.
Before anyone talks about how many pieces to hold, get one number on the table: how many units of a given SKU leave your shelf per month, and how many months of cover you are holding right now. If you do not have that, pull your last two quarters and count. Everything else in this article depends on it.
03Classify the assortment into three depth tiers
I sort k gold wholesale designs into three buckets for planning purposes, and each bucket gets a different depth rule. This is not a merchandising theory, it is a warehouse rule that keeps your open-to-buy from being eaten by the wrong inventory.
Tier one: core runners
These are the plain, repeatable designs that sell every month without support. They should carry the deepest cover, because a stockout here costs you the easiest sale you will ever make. Target 2.5 to 3 months of cover at any time, with a reorder triggered at 1.5 months remaining.
Tier two: seasonal and trend pieces
These move for eight to twelve weeks and then flatten. Hold one to 1.5 months of cover, and plan to be nearly sold out by the end of the season. Carrying trend k gold into the next quarter is how buyers end up discounting in month five.
Tier three: test and capsule SKUs
New designs, small capsule collections, custom requests. Hold less than one month of cover. If a test SKU hits 50 percent sell-through in the first 45 days, promote it to tier one and reorder with air freight. If it does not, let it run down and do not repeat it.
This is where factory-direct buying changes the plan. Because we run stock MOQ at 1 piece and custom MOQ at 30 pieces, you can test at a depth that a trading company would refuse. A trader with a 200-piece minimum forces you into tier one depth on a design you have not proven. That single difference in minimums is worth more to your six-month plan than a few percent off unit price.
04The depth versus sell-through table I use
Below is the working table I hand to buyers when we build a six-month k gold wholesale plan together. The cover targets assume a 30-day month and a reorder lead time of 12 to 18 days for production, plus shipping.
| Tier | Target months of cover | Reorder trigger | Typical SKU count share | Certificate basis |
|---|---|---|---|---|
| Core runners | 2.5 to 3.0 | 1.5 months left | 30 to 40 percent | GRA plus IGI on request |
| Seasonal and trend | 1.0 to 1.5 | 0.75 months left | 35 to 45 percent | GRA standard |
| Test and capsule | Under 1.0 | Sell-through check at 45 days | 20 to 30 percent | GRA standard |
Read the table as a range, not a rule. A buyer with a fast e-commerce channel can run leaner on core because reorders land in days. A buyer supplying retail doors with fixed delivery windows needs the upper end, because a stockout in a store is a much louder problem than a stockout online.
05Reorder cycles are where the plan actually breaks
Almost every failed six-month plan I have seen failed on reorder timing, not on the initial buy. The buyer planned the opening order beautifully, then discovered the second order arrived three weeks late and the shelf went empty in the middle of the strongest month.
Our production runs 12 to 18 days for custom work, and stock items move faster. Add DDP delivery at 5 to 8 days to your destination, and you are looking at roughly three to four weeks from confirmed order to shelf. Plan your reorder trigger backward from that, not from what feels comfortable.
The reason our cost, speed and yield run about 20 percent better than typical trading companies is not magic. We cut and set stones in the same building where we do final QC, so a batch does not sit in a queue waiting for a third party to inspect it, and a rework does not travel across a city. The middleman margin and the double handling come out of the timeline, and that shows up directly in how tight your reorder cycle can be.
Depth is only cheap if it turns. A deep position on a proven runner buys you sales; a deep position on an unproven design buys you a storage bill.
06Cash, certificates and payment terms in the six-month view
Inventory depth is a cash decision as much as a stock decision. Every extra month of cover is money sitting in metal and stones instead of in your account. For a six-month plan, I would keep total k gold wholesale inventory value inside a band you can actually finance without stretching payables.
On the paperwork side, plan certificate coverage by tier. GRA certificates come standard with our moissanite and lab-grown pieces. IGI certificates are available when a buyer needs them for higher-value items or for a retail partner that demands a recognized lab report. Decide that at order time, because adding certification after the fact slows the pre-ship stage.
Payment structure matters for planning too. We work on T/T with 30 percent deposit for production orders, and PayPal for samples so you can test a design without wiring money. Sample orders at 1 piece MOQ mean your tier three tests can start this week rather than next quarter.
07QC checkpoints that protect a six-month commitment
When you commit to depth, you are also committing to the quality of a larger batch. Our three-stage QC exists for exactly that reason: incoming stone check before anything is set, in-process inspection during assembly, and a pre-ship AQL check against the agreed standard. If you are holding three months of cover on a runner, you want that batch verified before it leaves, not after it reaches your shelf.
Two practical habits for buyers planning six months out:
- Ask for the pre-ship AQL result on every reorder, not just the first one.
- Keep a photo record of the approved golden sample, so reorder batches are checked against a physical reference rather than memory.
- Flag any design where you plan to hold more than two months of cover, so we can schedule it earlier in the production window.
08Frequently Asked Questions
What is the minimum order for k gold wholesale?
Stock items start at 1 piece, which is how most buyers run their test tier. Custom designs carry a 30-piece minimum per style, and that is where the deeper depth planning usually begins.
How long does production and delivery take?
Custom production runs 12 to 18 days, and stock orders move faster. DDP delivery adds 5 to 8 days to your door, so plan reorder triggers around a three to four week total cycle.
How is price quoted on a k gold order?
Price is quoted per piece based on metal weight, stone grade and setting, with certificate type factored in. Larger depth commitments are quoted against the confirmed quantity and delivery schedule.
09Let us build the six-month numbers with you
If you send me your current sell-through by SKU and the cover you are holding today, I will map it against the three tiers and tell you where your depth is wrong. We can quote a sample at 1 piece, price a custom run at 30 pieces, and lay out a reorder calendar that fits the 12 to 18 day production window. Reach the team at service@holycome.com or WhatsApp +86 133 7744 7107 and ask for the six-month k gold wholesale plan.