Bracelet lines run out at one length before they run out of design. One pattern may be stocked in four lengths and the four move at different rates, so a strong design with a flat length curve can sit empty at one wrist size while the others hold stock. Reorder timing is a question about a length curve, and stock depth is about how much of each length to hold while the next batch is made.
01Why a bracelet line runs out by length rather than by design
A bracelet is bought by its inside circumference, and the lengths that make up a line are close enough in a photograph to look like one item and far enough apart on the wrist to be different products.
Three lengths, three demand curves
A line offered at 178 mm, 190 mm and 203 mm is not one line with two extras. Buyers order the middle length in depth and treat the ends as add-ons, but the ends carry the sizing sales. An 8 inch leg can be 12 percent of units and still empty first, because it is the least likely to be substituted.
Where the length is set
Two constructions set length at different moments. Chain and bead strands are cut from stock bought by the metre, so an 18 cm and a 20 cm order share a reel until the cutter divides them. Cuffs and solid bangles share nothing: a 190 mm mandrel makes a 190 mm cuff, and a short cut cannot be recovered. One carries length as a cutting decision, the other as a forming decision closed at the bench.
Length drift after sale
A stretch strand relaxes. Cord that fits on dispatch can gain a few millimetres across a season, so fit returns arrive later than a clasp fault would and cluster around wrist size rather than around beads. Reading returns by length is what shows this.
02What the reorder point has to measure before it is set
A reorder point is a number of units per length, set only once demand, lead time and open orders are read at the same level.
Demand per length
The useful figure is units per length per week, not units per design per month. A design selling 40 pieces a month across three lengths, 22 of them at the middle, has a middle demand near five a week and end demands near two each, and the three refill at different moments.
Length as supplied
The inch label is a trade name, not a measurement. A nominal 7 inch chain with the clasp closed can measure 178 mm or 185 mm depending on clasp and jump ring, so the reorder sheet should record the inside circumference in millimetres as supplied. Two suppliers delivering a 7 inch under one name but a different reading is a stock error that reads like a demand error.
Lead time as weeks, not as a promise
Reorder timing depends on the interval from purchase order to dock, counted in weeks. Production, plating, assembly, packing and freight each add days, and the sum is the period the standing stock must cover. A lead time held as a promise hides the weeks that matter.
A reorder point is a number of units per length, set only once demand, lead time and open orders are read at the same level.
03How stock depth is set against lead time rather than against last year's total
Depth is a buffer in weeks of demand per length; last year's total is a figure in units that says nothing about which wrist sizes carried it.
The two figures that set depth
Cover equals measured lead time in weeks plus the interval between deliveries, and safety stock is the part held against a spike or a late batch. A length selling five a week on a ten week lead needs about 50 pieces to cover the period; one selling two a week needs about 20, and holding the same of both ties money in the slow end.
Consumables counted with the strand
Clasps, jump rings and stretch cord are bought on a different cadence from the finished piece. A strand that cannot ship for want of a clasp is a stock-out caused by a part costing a fraction of the item. Counting these against the length they serve keeps the run-out from arriving as a surprise.
Reading the curve against returns
When returns concentrate at one length, the fix is often a stock decision before a product decision: offering 178 mm and 195 mm instead of 178 mm and 190 mm moves the sales rather than adding a length.
| Record | What it must state | What fails without it |
|---|---|---|
| Length as measured | Inside circumference in millimetres with the clasp closed, beside the inch label | Two suppliers who both call it 7 inch |
| Demand per length | Units per length per week over a stated window | A total that hides which wrist size sold |
| Lead time | Weeks from purchase order to dock, measured rather than promised | A reorder placed after the empty shelf |
| Open order | Units per length already placed and not yet received | A double order or a gap nobody saw |
| Parts stock | Clasps, jump rings and cord counted against the length they serve | A strand that cannot ship for want of a clasp |
| Return reason | Reason code read by length as well as by design | A sizing fault recorded as a product fault |
Read across the table and each line is a field a buyer can carry into a stock sheet before the season. Read down the last column and each line is a run-out that would otherwise arrive after a shipment lands. Set per length and against a measured lead time, these lines turn a bracelet reorder into a plan rather than a quantity guessed from last season's total.
04What a reorder rule has to fix before the next length is placed
A reorder rule is a number of pieces, not a feeling that the shelf looks thin. Set it in pieces per length, because one bracelet design is three products wearing a single photograph — 178 mm, 190 mm and 203 mm move at different rates, and the slowest of the three often decides when the whole line is bought again.
Set the point in pieces, not in weeks
Weeks of cover hide the difference between lengths. A tray holding fifty pieces of 190 mm and eight of 203 mm reads healthy as a total; the 203 mm strand runs out first, and it is the length a customer cannot shorten at home.
Hold the buffer above the measured lead time
The reorder point equals the pieces sold during lead time plus a buffer. With a measured lead time of ten weeks at five pieces a week, the point sits near fifty pieces, not near the eleven left on the tray.
Read the trigger on the same day each week
A rule checked on the selling day finds a run-out, not a gap. Pick one day, read every length, and count what has landed rather than what is promised.
05How to read a stock sheet so a run-out shows before it happens
The sheet is read in one sitting, in a fixed order, every line per length. Two figures carry most of the meaning: pieces left and pieces placed.
Separate sold from shipped
A length can look full because a parcel landed. If those pieces are promised to two accounts, the shelf is empty for the walk-in customer. Record placed units on their own line.
Count the parts against the lengths they close
A strand held up by one clasp is a run-out with a full tray. Clasps, jump rings and cord are bought on a different schedule from finished pieces, so a sheet that counts strands but not the parts that close them reports a full shelf.
Read the return reason by length
Returns cluster by length, not by design. When one length keeps coming back for fit, the answer is a sizing note or a second length, not another order of the same pieces. A sizing fault logged as a product fault leads to the wrong reorder.
06How a measured lead time turns into a rule that carries across seasons
Lead time is measured from landings, not quoted from a catalogue. The last three arrivals give a working figure, and that figure is what the quantity is built on.
Rebuild the rule each season from the landings
Quoted lead times drift. A length sized against last season's promise arrives after the demand that justified it.
Watch the length that carries the fit
Fit returns rise when only the middle length is stocked. The ends are the sizes a customer cannot adjust, so they sell out first even when they sell in smaller numbers; the 8 inch length may be a small share of pieces and still be the first gap on the tray.
Write the rule into the order
A rule on a stock sheet is a habit; a rule in the purchase order is a term. State the reorder point, the buffer and the review day per length, and both sides read the same sheet.
| Field | What the stock sheet has to state | The failure it prevents |
|---|---|---|
| Reorder point | Pieces left per length at which the next order goes out | An order placed after the tray is bare |
| Buffer | Weeks of cover held above the measured lead time, per length | A gap during a late landing |
| Lead time used | Days from the last three landings, not the quoted figure | A quantity sized to a promise |
| Trigger day | The one day each week the sheet is read for every length | A run-out found on a selling day |
| Part count | Clasps and cord counted against the lengths they close | A strand held up by one clasp |
| Sell-through | Pieces sold per length per week, kept apart from the total | A slow length reordered with a fast one |
07Order Terms for Wholesale Buyers
MOQ is 1 piece for stock styles and 30 pieces for custom work, and loose stones are sold by the carat. Sampling takes 7 to 10 days, and bulk production runs 15 to 25 days after the sample is approved. Pricing is quoted per piece or per carat depending on the item. Payment is T/T with a 30% deposit and the 70% balance before shipment, and PayPal is accepted for sample orders.
08Frequently Asked Questions
How often should a bracelet stock sheet be read?
Once a week, on a fixed day, across every length. A weekly read still leaves cover to order against.
Should the reorder point be the same for every length?
No. Each length carries its own selling rate and its own share of fit returns, so the point is set per length. A single figure for the design hides the end sizes that sell out first.
What if the quoted lead time is shorter than the measured one?
Size the order on the measured figure from the last three landings. The quoted time is a plan; the landings are the record the tray has already lived through.
Why count clasps separately from strands?
Because they arrive on a different schedule. A full tray of strands can still be unsellable for want of a clasp, so the sheet carries parts as their own line against the lengths they close.
Set this way, a bracelet reorder becomes a plan: read the sheet weekly, hold the buffer above the measured lead time, and keep the ends of the range stocked on their own rates. Buyers who want the same figures on finished pieces can read our guides to sizing and stock control, see what is currently shipping in the about our production and capacity section, or check the terms that govern returns and data in our returns and privacy policy.